· Beijing Transportation Committee: 7 high-speed Spring Festival, such as Beijing-Tibet Expressway, is still the busiest

The reporter learned from the Municipal Communications Commission that during the Spring Festival of 2017, all toll roads in the Beijing area will be exempt from tolls for passenger vehicles with less than 7 seats (including 7 seats). The time is from January 27 (New Year's Eve) from 0:00 to February 2 At 24 o'clock in the morning (the sixth day), the time when the vehicle leaves the exit toll booth shall prevail. In addition, seven high-speed traffic pressures such as the Beijing-Tibet Expressway will remain relatively prominent. The Beijing News reporter Guo Chaochu six nights into the Beijing traffic flow free passage, the small passenger car free dedicated channel is not issued card lift release; ETC lanes maintain the current non-stop mode, free small bus tolls zero, the paid vehicles are normal Charges; the remaining ordinary lanes maintain the current license card and payment mode, and the free passenger cars are released free of charge. It is planned to resume the card issuance at 21:00 on February 2nd.
According to reports, the daily traffic volume of the toll roads for the 2017 Spring Festival holiday is expected to be about 1.45 million per day, an increase of about 6.6% over the same period last year (1.36 million), and the peak day may exceed 1.7 million. It is expected that the traffic pressure in the direction of entering the Beijing area will be more prominent in the late holidays, and some highways will have concentrated traffic flow and heavy traffic pressure during peak hours.
Although the traffic pressure on the highway during the Spring Festival holiday is generally at a low level throughout the year, it is expected that the distribution of traffic pressure will remain uneven due to factors such as visiting relatives and friends, short-distance outings and late-stage travel to Beijing. Jingzang Expressway and Jingkai The high-speed, Beijing-Hong Kong-Macau Expressway, Jingping Expressway, Jingha Line, Jingcheng Expressway and Jingtong Expressway will continue to be relatively prominent. The airport expressway is lower than the normal level, but due to its own characteristics, it also needs to be focused.
From 9:00 to 12:00 and from 14:00 to 16:00, the peak traffic pressure of the road network may be between 10:00 and 11:00. On the last night of the holiday, the traffic pressure of some highways entering Beijing will be more prominent.
Severe congestion or closed entrances In order to improve the efficiency of toll roads, during the free passage period, the main toll stations of the toll roads in the city's metropolitan area will set up special channels according to the actual traffic flow and vehicle distribution. The small passenger car lanes are not less than the number of lanes. Excluding ETC) 40%. Conditional ramp stations will also set up a dedicated free passage for minibuses.
Install a small passenger car lane warning sign at 1000 meters and 500 meters in front of the toll booth for the special bus lane. The dedicated channel toll island head is equipped with a small passenger bus lane sign to remind small passenger car drivers to pass.
When there is serious congestion on the main road, the maintenance, road production and charging departments will cooperate with the traffic control department to take measures such as diversion and traffic guidance. When the main road traffic is interrupted due to vehicle congestion, the blocked vehicle will be freely exported from the nearest toll outlet of the blocking point; at the same time, the traffic control department will open the U-turn valve in the station area, and the vehicle will drive from the U-turn valve to the opposite lane, and the nearest exit Free access.
When the free policy attracts a large number of traffic into the toll road and seriously exceeds the carrying capacity of the main road, the traffic control department may take the toll road entrance closure measures in the road and toll station areas.
In addition, during the peak hours of the traffic flow, the toll station guarantees a 100% lane-opening rate to ensure the rapid passage of vehicles. When the special personnel situation causes the passengers to stay for a long time, the relevant departments will start the emergency plan and do the relevant service work. The service area will provide basic services such as refueling, drinking water, food, and free rest for the rest or stranded vehicles.


In the process of Machining Titanium alloy, the titanium alloy material itself has low modulus of elasticity, large elastic deformation, high cutting temperature, low thermal conductivity and high chemical activity at high temperature, which makes the sticky knife phenomenon serious, easily aggravating the tool wear and even breakage, which leads to the poor machinability of the titanium alloy. Therefore, machining titanium alloy requires proper cutting tools and good machining technology.

Machining Titanium

Machining Titanium,Titanium Machining Parts,Titanium Cnc Turning Machining Parts

Buildre Group Co., Ltd --- Hong Kong RYH CO., LTD , https://www.bldcncmachining.com